Opens in a new tab
[wpdreams_ajaxsearchlite]

Planned quietly. Approved quickly.

 

“Too loud”—BESS projects fail more often because of this than because of technical issues.
That’s why we treat sound insulation not as an afterthought, but as a design parameter—from day one.

Four factors make our storage systems quiet:
→ Operating strategy with noise reduction during critical phases
→ Noise reduction kits available ex-factory and retrofittable on-site (e.g., 50 dBA @1m)
→ Optimized airflow design in custom-built units (up to 30 dBA @1m)
→ Structural measures at the installation site

The result: the right, acoustically optimized solution for every project.

Three things that make our stack special:
→ Capable of black start. The system starts up without an external grid.
→ Built for harsh environments. Up to 4,000 m, 6.4 kV surge resistance, UN 38.3.
→ PROFINET as the standard. Plus PROFIsafe, EtherCAT, CAN, BiSS-C, EnDat 2.2, and SSI.

Read more about this in the

PDF.
White modular energy storage containers at sunset