Energy & Service Systems

More than storage. Functioning complete systems.

Storage systems for trading, optimization, co-location and microgrids - planned, implemented, operated.

We supply single-level and multilevel storage systems with our own control and operating platform. ESS is responsible for the entire life cycle: system planning, implementation and professional operation.

The focus is on integration, technical operability and economic scalability.

Our competitive advantages

  • Patented multi-level inverter system - the most efficient system on the market. 100% second-life compatible, compatible with all batteries and manufacturers.
  • The only provider with single-level and multi-level technology from a single source.
  • Modular & scalable - from 40 kWh to 6 MWh.
  • Cell chemistry flexibility - NMC, LFP and Na-Ion.
  • Multi-level NG in cooperation with Bosch (ecore).
  • 300 MWh in implementation by 2028, of which 140 MWh already projected.
  • Turnkey EPC delivery including storage, low and medium voltage system, transformers, civil engineering and grid connection.
  • Europe-wide project team with decades of experience - from submission to the authorities to ongoing operation.
Battery storage container on company parking lot with charging stations

Areas of application

Anwendung Beschreibung
Eigenverbrauchsoptimierung Überschüsse aus eigener Erzeugung für den Eigenbedarf nutzen, Netzbezug und Energiekosten senken.
Optimierung der Netznutzung Strategischer Speichereinsatz in bestimmten Zeitfenstern zur Nutzung reduzierter Netzentgelte.
Spotmarkt-Arbitrage (SMA) Handel an der Strombörse durch Nutzung von Preisdifferenzen bei konservativer Kapazitätsfreigabe.
Zeitversetzte Einspeisung Zwischenspeicherung zur Vermeidung von Abregelungen und zur Ertragsoptimierung.
Lastspitzenkappung (Peak Shaving) Gezielte Speicherentladung zur Reduktion der Jahreshöchstlast und Senkung der Netzentgelte.
Sekundärregelenergie (SRL) Zusätzliche Erlöse durch Bereitstellung von Regelleistung.
Multi-Use-Strategie Kombination mehrerer Anwendungen mit Priorität für lokale Anforderungen.

Our estorage product portfolio

EBS Group Logo, Unternehmenslogo für professionelle IT-Lösungen in Deutschland.

Modular small storage systems up to 160 kWh with and without hybrid inverters.

Learn more

EBS Group Logo und Firmengebäude, professionelle Gebäudereinigung und Facility Management.

Modular all-in-one commercial and industrial storage systems for energy optimization and entry into the trading market.

Learn more

EBS Group Logo und Firmengebäude, professionelle IT- und Telekommunikationslösungen.

Large-scale storage projects with central inverter technology and full connection to medium-voltage system including transformer.

Learn more

Hochwertige Gebäudetechnik und innovative Lösungen bei ebs group in Deutschland.

Our EMS increases efficiency, reduces costs and enables a more sustainable use of resources.

Learn more

Small storage tank

Modular all-in-one systems for outdoor use - Made in Germany.

Eigenschaft Wert
Kapazität 40 – 160 kWh
Leistung 20 – 80 kW
Ausführung Rack
Max. Parallelschaltung 10 Einheiten
CAPEX ab 240 EUR/kWh
Large white industrial unit with ventilation grille

Features:

LFP cells, IP65 protection class, integrated active aerosol extinguishing unit, connection to fire alarm systems, emergency power supply, mains-independent operation.

Contact us now

Commercial & Industrial

Scalable commercial and industrial storage systems for energy optimization and for entry into the trading market.

Eigenschaft Wert
Kapazität 225 kWh – 4,5 MWh
Leistung 100 – 2.250 kW
Ausführung Rack, Container
Garantie 10 Jahre / bis zu 8.000 Zyklen auf 70 % Kap.
RTE bis zu 95 %
CAPEX ab 165 EUR/kWh
White industrial control cabinet with warning symbols

Available system types:

Single-level ESS
Outdoor Cabinet or Outdoor Container. Maximum fire protection thanks to monitoring system, integrated gas extinguishing system and fire detectors. Variable C-ratios (0.3-0.5). Suitable for industry, manufacturing, residential complexes, telecommunications, warehouses & logistics, electromobility.

Multi-level ESS
Award-winning system. Combines patented inverter system with second-life batteries from electromobility. C-rate 0.3 - ideal for co-location and behind-the-meter optimization. Thanks to patented inverter technology, weak cells only marginally reduce the overall usable average.

Comparison of single-level vs. multi-level:

Kriterium Single-Level Multi-Level
Anschaffungskosten ab 120 EUR/kWh ab 221 EUR/kWh
Nutzbare Energie über Lebensdauer 100 % 115 %
Ausfallsicherheit (Modulebene) bis 95 % bis 97,5 %
Effizienz Leistungselektronik 91 % 95 %
C-Rate 0,3 C & 0,5 C 0,3 C

Utility Scale

Large-scale storage projects with central inverter technology and full connection to medium-voltage system including transformer.

Eigenschaft Wert
Kapazität ab 4.500 kWh
Leistung > 2.990 kW
Ausführung Container
CAPEX ab 120 EUR/kWh
Energiespeicher-Container für nachhaltige Energieversorgung, EBS Group.

Battery containers up to 6.3 MWh:
Modern LFP technology, integrated thermal management (water cooling), fire management and detection system, aerosol extinguishing system, very high RTE.

Central inverter systems + combined systems (medium voltage):
European and Asian solutions, outdoor installation, various power levels and integration depths.

EPC project process at Utility Scale:

  1. 1. Engineering (planning & design)
  2. 2. Procurement (sourcing & delivery)
  3. 3. Construction (civil engineering & electrical installation)
  4. 4. Commissioning & tests
  5. 5. Documentation & handover
  6. 6. Optional: Operation & Maintenance (O&M)

We take over individual steps or the entire process.

Energy Management System (estorage EMS)

The real-time energy management system enables the monitoring and control of energy consumption, sources and storage. It increases efficiency, reduces costs and enables a more sustainable use of resources.

Fields of application:
Commercial, industrial, residential, agricultural, energy centers.

Functions:
Real-time monitoring, dynamic load management, PV surplus control, exchange power optimization, EV charging infrastructure integration, remote access via ecoCloudConnector.

Typical project process

  1. 1. Initial meeting and target definition
  2. 2. Location and network analysis - rough concept after a short 30-minute assessment
  3. 3. Detailed planning, design, coordination, offer
  4. 4. Electricity law planning, fire protection, noise protection, nature conservation planning
  5. 5. Submission to authorities, building permit
  6. 6. Installation, commissioning, testing, documentation
  7. 7. Operation, monitoring, maintenance, optimization

NIS2 - Legal outlook

NIS2 places greater focus on data security in energy systems - especially for inverters, BMS and EMS. e.bs relies on European solutions with EU-based data storage and supports operators in the early documentation of components and data flows.

Realized projects (selection)

Standort Kunde Kapazität Anwendung
Niederlande BGO Expat Housing 3 × 233 kWh Peak Shaving
Schweiz Bischof Lebensmittellogistik 1.569 kWh Eigenverbrauch, Optimierung, Notstrom
Österreich Kleinwasserkraftwerk Martina Walch 261 kWh Notstrom, Wasserversorgung
Deutschland Goldbeck 261 kWh Selbstverbrauch, Optimierung, EV-Ladeinfrastruktur
Österreich ZM3, Götzis 261 kWh Selbstverbrauch, Optimierung, EV-Ladeinfrastruktur
Steiermark (A) Viktor Kaplan Muerz 4 MWh Eigenverbrauchsoptimierung, Ladeparkmanagement
Altenburg (A) Stift Altenburg 1,2 MWh Selbstverbrauch, EV-Ladeinfrastruktur, Notstrom
Wien (A) Wien Energie 4 MWh Selbstverbrauch, Optimierung, EV-Ladeinfrastruktur

What sets us apart

  • Risk minimization - many years of experience in the construction of storage projects
  • NIS2 compliance - data storage and cyber security as a core element of supply security
  • Turn-key - planning and implementation from a single source eliminates interface problems
  • Regional proximity - fast response times and short communication channels
  • Long-term availability - in-house production of BES and direct cell sourcing
  • Technology mix - LFP, NMC, sodium ions, multi-level & single-level

Next steps

  • 30-minute short assessment - We clarify your objectives and boundary conditions: CAPEX, noise, C-rate, enclosure, grid connection point, emergency power requirements.
  • Storage engineering - We use a digital twin to calculate the entire storage system and provide clear technical and economic recommendations.
  • Result - Several suitable platform options including profitability calculation.

Are you planning an energy storage system?

Send us your location, power class and use case - trading, self-consumption, microgrid or co-location. We will respond within 48 hours with an initial design.

Contact us now
Smiling man with a light blue shirt against a gray background

Your contact person

Joe Strasser
Sales Manager
service@ebs-group.io